This hot mop roofing application is seen almost entirely in commercial buildings.
How to hot mop a roof.
At the same time a 90lb felt or modified bitumen cap sheet which is a type of asphalt that is modified with rubber or fiber is applied onto the hot asphalt.
The hot mop roof bur installation job can be completed within 2 to 4 days depending on the size of the roof and the number of installer we ve put on the job.
This is great news especially because the average tile roof will take anywhere between a week to up to 10 days to be completely installed.
Hot mop roof basics.
The asphalt is applied to the roof using a heated mop.
The heat of the asphalt can easily burn the installers so additional care has to be taken during the installation process.
The installation of a hot mop roof is a messy experience.
An application of aluminum fiber coating quickly seals many small leaks and can prolong the life of a roof.
A modified bitumen cap sheet is then applied to the asphalt and both layers are nailed to the roof.
During my 30 years in the roofing business i ve installed many types of roofing and seen a number of products come and go.
Basically asphalt blocks are melted into a cauldron or bucket once melted it is poured onto the roof and a team of installers will mop it into place.
It involves spreading a layer of hot asphalt on the base layer of the roof.
How to hot mop a roof step 1.
Hot mop roofing is a very dirty and somewhat dangerous job it s essentially putting molten asphalt tar over a roof.
However we do occasionally see it on porch roofs on homes or other flat roofing area s also referred to as.
It cannot be applied over a gravel topped or mineral surfaced roof however.
Use a staple gun to layer rosin paper lengthwise over the roof and cant strips.
Off the cuff typical range of roof lives not counting repairs if physically pierced maybe 8 20 for built up tar and felt hot mop 10 20 for peel and stick 12 25 or even up to 30 for tpo epdm uv protected pvc like hypalon 30 50 for hdpe.
To begin the hot mop process a layer of hot asphalt will be spread on top of the roof s base sheet.
Nail 45 degree cant strips at all inside corners 12 inches on center using a hammer and roofing nails.
The hot asphalt is laid out evenly with a large heated mop over the surface.
If short handed staple one end.
Hot mopped asphalt roofing hot tar.
Apply plenty of roofing cement to fill the void and smooth the cement so water can run off unimpeded.
Layer and nail base sheets shingle.