You ll need to know how wide your door frame is so the jamb fits in it.
How to install a sliding closet door on door frame.
Nail the rest of the frame up around the door but keep checking with the level to ensure it is equal all the way around.
Tilt the door into the opening with the bottom side going in first using shims as necessary to create a secure fit.
You will need to add 1 2 of plywood between the 2x4 s to get the right wall thickness of 3 1 2.
Hold the tape measure up to the top of the door frame.
Flip the door so that the newly attached plywood side faces down.
Use shims under screw holes to help keep your threshold in good shape.
Note the measurement and save it for later.
Learn how to install a barn door and what tools wil.
Attach the plywood sheet to the back of the door.
Measure the width of the door frame.
Check that the opening is the correct size for the bifold or sliding doors you will install.
This is the actual thickness of a 2x4.
To install the doors install the track on the top of the door s frame.
To make the door header the top of the door frame cut two 2x4s to the same length as the width of the original opening and nail them securely together.
Place your door hinges and secure them in place with screws.
Finish the opening by installing drywall on each side.
Break out the tape measure.
Apply wood glue on all top surfaces of the pieces of both your inner and outer frames.
Apply wood glue on all top surfaces of the pieces of both your inner and outer frames.
Keep in mind that if the door has 2x4 walls then the frame will be 4 1 2 11 4 cm.
With this step by step guide you ll have stylish functional barn doors hanging in your house in no time.
Use a level to keep up with how even the frame is.
Place the plywood on top of the frame apply wood glue and secure it with screws once it s aligned.
Complete the nail install on the lower left hand side of the sliding door frame.
Cut the door header.
Measure the diagonals to be sure that the opening is at least within 3 8 inch of square and ensure that the sides are plumb and the header is level.
Place the plywood on top of the frame apply wood glue and secure it with screws once it s aligned.
Place shims around the edges and top of your door frame every 12 inches.
Keep checking with your level to see if it is even.