For example for every 8 length of base plate install only two concrete anchors.
How to install dricore wall panels.
Once the walls are framed and in position simply screw the bottom plates of the 2 x 4 wall to the dricore subfloor panels using 2 wood screws.
When you start your second row the panel must be at least 6 wide.
Start at the longest wall and pre measure the length and width of the floor area to ensure the last panel pieces in each row end are greater than 6 in width.
Christine of the diy dreamer recommends measuring your first row prior to installation.
Adjust the starting panel of each row to accommodate for the end of row panel width.
Make sure that your last panel is at least 3 wide.
How to install dricore smartwall what is dricore smartwall.
Measure to include the spacer material.
If you are planning to use metal studs in place of wood the base track for the studs should be affixed to the dricore panels with 5 8 wood screws as a maximum.
Metal stud base plates should be anchored in concrete every 2 when installing over dricore panels.
Install your 2 x 4 walls directly on top of the dricore subfloor panels measuring for a snug fit between the panels and ceiling.
Dricore subfloor panels need minimal equipment to install as they are designed to interlock with a tongue and groove feature.