If using j trims for the corner install before panel installation.
How to install metal wall panels.
Metal panels are made to overlap a few inches in the grooves.
For example if the wall is 11 feet 3 4 m long and each siding panel is 2 feet 0 61 m long you would need 5 panels and 1 half size panel.
Screw the new panel in place as described.
This will keep the wall straight as you place additional panels.
When it comes to installing the.
Install the panel so that the short lip overlaps the large lip.
Install j trim if large j trim with frieze was not installed with the ceiling liner.
The silicone will spread and adhere creating a seal.
Start the first panel in a corner with the overlap side of the steel toward the corner.
Cover corners with inside corner trim.
Raising the panel prevents rusting that can occur if the bottom of the metal gets wet.
X research source measure the wall before you start installing the panels so you know exactly how many panels and partial panels you need to use.
Continue adding panels until the roof is covered.
For vertical installation start at one side of the wall and position the panel at least 1 2 inch off the floor.
Gently remove any crown moulding baseboards and trim you plan on using again.
When installing metal panels it is vital to get your first panel squared.
Corrugated metal wall panels are pieces of ribbed metal used to cover or protect a wall.
It will take two people to install the metal panels one to hold the panels in place and the other to insert the screws.
Run a bead of 100 percent silicone sealant along the underside of the short edge of the next panel.
For best results set the paneling in the room for a few days before you install it.
By installing the first panel square the rest will follow suit.
They are a popular choice for siding walls because they are durable and easy to install.
Fasten panels by screwing through the flat into studs at 2 on center.