Cut to fit pitch of roof and around vent.
How to install polycarbonate roof panels.
The base is screwed down to the framing.
Allow for a minimum of 18 inches 46 cm if you need to lap to complete the run.
It is made of polycarbonate and is a one part system.
Do this by sliding the first panel of the roof into the channel of the f trim.
You install this by installing your sheets loosely and sliding this from the bottom of this joint all the way to the top.
Apply front and back panels similarly to side walls.
Some additional considerations for this project.
Nail trim limber to all corners and to front and back where panels meet roof.
After cutting the panels into their proper length you should install the aluminum f trim to the edge of the roof timbers.
If yours do not.
Fasten aluminum ridge roll flashing to each panel as you proceed.
Polycarbonate base and cap this system consists of 2 parts a base and a cap.
Seal it using silicone caulking.
Some panels have pre drilled holes.
Wear hearing and eye protection.
Angle grinder 1 x research source the fastest option.
The supporting cross sections going through the middle can i directly screw them to the wood framing or do i need the foam between the panels and wood.
Step 1 cut the panels to the desired length.
Most panels come up to 32 feet 9 8 m in length.
Thank you for your time.
The sheets are placed over the base.
The roof panel should be installed on every timber support.
Circular saw 2 x research source slower than angle grinder but follow same step 2 pre drill holes on the ridges.
I am using the closure foam on the top bottom and sides.
I am installing the polycarbonate suntuf panels to the roof of my greenhouse.
As one of the most important elements of any structure the roof must be installed correctly to provide effective long term protection for whatever s inside.
Paint or prime cut edges to prevent rust.
Fixing the panel of the roof.
However if this is your first roofing project it can be a little overwhelming when you consider the many steps involved when installing polycarbonate roofing sheets.
Install vent as close to roof peak as possible.