Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
How to install roll roofing shingles.
Use a trowel to scoop up the roofing cement.
Do not use the eaves as a guide instead because they can be uneven.
To seal a plumbing vent spread roofing.
Snap a chalk line as a guide for the first layer roofing.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the valley.
How to do it attach first course.
Mark a chalk line to identify the end of your first layer.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Repeat this on both sides of the roof.
Install peel and stick roofing in a similar manner.
Installing the rolled roofing 1.
Using a measuring tape measure 35 inches 89 cm up from.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
Drip edge or drip cap is either plastic or sheet metal.
It also helps if you first install a layer of roofing felt.
Plan so that no two butt joints are closer than 2 feet from each other.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Every 5 inches make a new mark until you get to the rop of the roof.
For extra durability you may install roll roofing in two layers.
Spread the roofing cement along the.
Apply roofing cement to the roof.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
It not only protects the roof but it also protects the fascia.
Use the chalk line to snap a straight line vertically every 6 inches.