Attach drip edge along the edge of the roof with roofing cement.
Install roll roofing over felt.
Low slope means that these products are installed on roof slopes of 2 12 or more.
A second layer of felt paper must be installed to provide a proper base for the roll roofing.
The second layer of felt paper may not fit properly over the first so the homeowner must adjust it until it is tight and neat.
Roll out about 10 feet of.
Asphalt roll roofing installation roll roofing is simplest product to install on a small section of low slope roof is 90 pound roll roofing.
Tack it in place at the corner with the end flush with the end of the roof and the bottom edge of the roll right along the bottom of the roof deck over the drip edge.
Snap a chalk line on the top of the first piece 2 inches below the edge.
For a slightly sloped roof use the concealed nail method shown.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
Roll roofing is often installed over bare wood sheathing or sheathing that has been painted with a primer.
To install roll roofing you ll need to cut the material into long strips of the correct length for your roof and lay it flat.
Taking the time to properly prepare the sheathing will make all the difference in how quickly and easily the felt paper is installed.
You can install roll roofing on your own but it goes more smoothly with a helper so grab a friend and get started.
This is an inexpensive roofing material often installed over 15 felt underlayment by homeowners and do it yourself ers.
Install the rest of the.
The strips should always be horizontal.
It also helps if you first install a layer of roofing felt.
For extra durability you may install roll roofing in two layers.
Applying roofing felt first will better protect the sheathing against condensation as well as against leaking.
If the roof is sloped you can use the exposed nail method.
Position the first sheet tack the top every 2 feet and nail the rake and.
It must be cut and nailed in the same manner as the first but with an overlap.
Visit your local hardware store and ask for enough rolled roofing to fit the area of your roof.
Using the exposed nail method snap a chalk line 35 inches above the eave.