Ideally it is recommended to nail about every 12 inches.
Installing a gutter drip edge.
You may need to nail through the starter strip into the drip edge.
How to install a drip edge.
If the gutter is not behind the drip edge there is a chance that rain or melting snow may not fall from the edge of the drip edge but instead cling to the metal and run behind the gutter.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
If it doesn t pull the drip edge out slightly from under the shingles.
Don t exceed it more than 16 inches.
Other causes of the water running behind the gutter if properly installed are roofing not extended 3 8 past drip edge improper overlap of drip edge ice.
You can use nails to tightly secure it.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Tools supplies tin sn.
Installing drip edge on your roof.
Slide the corner tight to the fascia.
With without rain gutters.
Begin at the lower corner of the roof and gradually progress to the top.
Be sure to tuck the drip edge under the starter strip and felt paper.
Secure the drip edge with roofing cement.
This is important to protect damage to your fascia soffits rafters.
Make sure the drip edge coming from the shingle is bending against the fascia board because when it rains it s going.
Use tin snips to cut the gutter apron flashing roll in two 3 in.
Raise the shingles and push the top rim of your drip edge beneath them.
Place a nail at one end then the other.
For drip edge installation align it for directing water flow into gutter alongside the roof edges.
If there s a drip edge installed where the fascia meets your shingles and the gutter is hung below the drip edge get some roll flashing and tuck it up under the drip edge and over the top of the gutter.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
There are two reasons for water getting behind the gutter.
Begin installation it is best to install a drip edge on a day with warm weather because it makes it easier for the shingles to be stripped back.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
If using a type c drip edge you can install a furring strip to increase its performance.
Home centers sell rolls of 6 in.
One of the reasons is that your shingles may be too short.
Rain gutter installation can be a tricky job and a lot of.