Cut a starter hole in the gutter with a chisel drill or sabre saw and nibble out the finished opening with tin snips.
Installing a gutter pop.
Step 3 optional catch basin.
Cut a triangular section from.
We provide a fully licensed plumber to do all your gutter.
Dig a trench large enough to hold the catch basin.
Project step by step 20 cutting the gutter.
To control the flow of water away from a roof gutter downspout installing a 9 to 12 inch catch basin is recommended.
It s much easier to join sections on the ground than to work from the top of a ladder.
Form strip miter joint at corner cover the joint between two lengths of gutter at each corner with a strip miter a 3 inch wide strip of aluminum.
Wrap the aluminum strip tight around the underside of the gutter.
Finally insert the filling into the hole and fasten it with short screws.
Snap the sections together.
Use the flange to mark the screwhole locations and bore 1 8 in holes through the gutter.