4 deep nail the drip edge to the sheathing every 16.
Installing new roof drip edge.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Once free slide the drip edge out and discard.
Make sure the outer edge extends over the gutter.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto the roof.
How to install a drip edge.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Place a nail at one end then the other.
How to install drip edge flashing to a new roof.
If it doesn t pull the drip edge out slightly from under the shingles.
You ll need to ask another roofing professional to hold up the shingles while you do so.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
The drip edge is nailed in place using 1 1 2 galvanized roofing nails.
Using drip edge with a nailing edge approx.
You may need to nail through the starter strip into the drip edge.
Secure the drip edge with roofing cement.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
On the eaves the peel and stick goes over the drip edge though there is some argument in the industry as whether this is the best way to install drip edge.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.