The roof area is 14 ft.
Installing rolled rubber roofing.
How to do it attach first course.
Install a drip edge around the perimeter of the roof.
Step 3 apply adhesive.
Spread the roofing cement along the.
Step 1 clean off the roof.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the.
Using a measuring tape measure 35 inches 89 cm up from.
This is the type of system i like to install best one of the key strengths of a rubber roof is the lack of joints and therefore potential leaks epdm rubber membrane can be cut to virtually any size from one piece without joins up to 15m x 30m.
Step by step roll roofing installation 1.
Remove any loose shingles.
One piece rubber roof fully adhered.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Puting the weather watch rolled roofing material on was real easy and fast to install.
Step 2 roll out rubber membrane.
Drip edge or drip cap is either plastic or sheet metal.
Installing an epdm rubber roof.
Mark a chalk line to identify the end of your first layer.
Cut the rolled roofing.
Before doing anything with your rubber roof take the time to thoroughly clean the roof.
The strips should always be horizontal.
Install peel and stick roofing in a similar manner.
For extra durability you may install roll roofing in two layers.
Use a trowel to scoop up the roofing cement.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Apply roofing cement to the roof.
To seal a plumbing vent spread roofing.
It not only protects the roof but it also protects the fascia.
Installing the rolled roofing 1.
The roofing screws were 1 1 2 inch and went thru the drip edge and into the stud below.
This aluminum flashing protects the edges of the roof sheathing.
Plan so that no two butt joints are closer than 2 feet from each other.