Lp smartside trim fascia.
Installing smartside wood siding panels.
Lp smartside trim siding products are treated with our proprietary smartguard process.
Tn 028 vertical siding.
Installation is basically the same regardless of how.
With four components of protection the process adds strength and helps our products withstand impacts freeze thaw cycles high humidity fungal decay and termites.
Check your local building codes before starting to install siding to confirm if wood structural panel wall sheathing is required.
Butt joints should be staggered over successive courses.
When installed over 24 on center framing you must use precision 190 series panel siding.
0 4375 in x 48 563 in x 95 875 in item 88997 model xssp25915.
How to install lp smartside trim siding.
Using a nail gun makes quick work of installing lp smartside products.
Some panel siding is installed with vertical wood battens over seams while other panels have tongue and groove joints to make a solid surface.
As in standard construction practices install smartside siding by nailing to studs spaced 16 inches on center using hot dipped galvanized nails.
Engineered wood siding installs faster.
Smartside 76 primed engineered treated wood siding panel common.
Installing panel siding all lp smartside panel siding may be installed over 16 on center framing.
Lp smartside 76 series lap siding may be attached directly to framing members spaced a maximum of 24 inches 610 mm o c.
The installation instructions recommend nails with a shank diameter of at least 113 inches and a head diameter of at least 27 inches.
Precision series panel siding.