Easy installation winterguard s adhesive bottom surface is protected with a disposable silicone coated release film which is split down the middle for simple and cost effective application.
Installling weatherguard self adhesive roofing.
Learn more about common installation practices for low slope residential applications including why owen corning deckseal roofing system is a preferred choice.
Cut the membrane into 10 to 15 foot lengths and re roll loosely.
Roll self adhered roofing underlayment 225 sq.
Tri flex 15 synthetic roofing underlayment is designed to tri flex 15 synthetic roofing underlayment is designed to overcome the shortcomings of 15 felt while delivering advanced benefits that save the contractor time and labor.
Simply prime peel and stick.
Black synthetic roll roofing underlayment.
The peal flop method is especially effective in valleys and other difficult places using manageable lengths.
Cut the membrane into 10 15 ft 3 5 m lengths and reroll loosely.
Premium breathable synthetic roofing underlayment roll.
Self seals around nails or metal roofing fasteners to help avoid leaks.
Press the membrane of the self adhering roofing underlayment in place with heavy hand pressure to ensure the desired adhesion to the roof deck.
Pull back 6 inches of the release paper in order to position the start of the roofing sheet accurately.
This video is showing the necessary steps for a perfect and easy installation of our flame free self adhesive roofing system.
Peel back 1 to 2 feet of release liner align membrane.
Mineral surfaced peel and stick roof leak barrier roll.
Peel the release liner from the membrane.
2 13 9 m 2 and 2 0 square 200 ft.
2 18 58 m 2 roll sizes.
Tri flex xt 48 in.
Grace ice and water shield 36 in.
Smooth down the sheet with your hand to adhere the roll roofing to the roof deck.
Apply roof covering material at temperatures of 40 f 5 c or higher.
Whether it is simply functional or shingled with expensive decorative materials the roof of your home is a shield against the elements.
1 5 square 150 ft.
Peel back 1 2 ft 300 600 mm of release liner align the membrane and continue to peel the release liner from the membrane.
Align the length of roll roofing with the lowest edge of the flat roof and flush to the side edge of the roof.
How to install self adhesive roof underlayment.